RECOVERING THE LOGS
With ropes and straps, archaeolo-
gists prepare the waterlogged cedar
wood timber at the bottom of the
well shaft for removal. A crane will lift
them, afterwards they will be soaked
in a lactose solution for preservation.
The excavation of the well-room is
coordinated by Conrad Schmidt (at
right).